Execution of dry ceramic facade of Mapna building by visual or clip method and aluminum curtain wall facade by cap method (face cup)
Description of the implemented project:
Execution of dry ceramic façade in Mapna building project by executing visible or ceramic visual facade ceramics with an area of approximately 2500 square meters with all volumetric indentations and vertical ceramic louvers and lamellar curtain wall of aluminum curtain wall with EPDM rubbers in the office The center of Ecoarc company was prepared in the form of shop drawing maps and was installed in the workshop by the engineering team and execution of ceramic facade of EcoArc company. Click on the linked phrase to see the companies implementing dry facades.
Project Information
Ceramic & Curtainwall Glazing & Aluminium Composite Facade
Strengths
As one of the top companies implementing dry facade in Iran, EcoArc Company has accompanied the Mapna building facade project in the supply and execution of two ceramic facade materials and curtain wall lamellar facade with the highest executive capacity.
The protruding and recessed volumes and vertical louvers created special complications due to the large number of types of porcelain ceramics in small and large sizes in the execution section, as well as the throw in the dry ceramic facade, which, of course, was the ultimate goal for those involved. The company implementing the dry facade should be the objective implementation of the architect’s plan, and executive issues or throwing ceramic facade are usually the next priority. Therefore, due to the mentioned complexities, numerous meetings and round trips of drawings and executive details with the project architect team continued until the desired result was achieved. Ceramics in two colors, white and brown, with a size of 60 x 120 cm horizontally According to the table of estimated area, the ceramic facade company (EcoArc) was purchased by the esteemed employer. Also in this project, the curtain wall facade system with the German RAICO system was prepared and implemented by EcoArc company and higher safety was provided by using the face cup system compared to the fram-eless system and also the lower cost of glass in the face cup system was provided.